Construction scheme of artificial lake

Release time:2020-4-7    This article is read :3747 Times

Construction scheme of artificial lake

1. The foundation soil layer is compacted (compactness ≥85%), to avoid the damage caused by the foundation sinking during use, which will bring adverse factors to permanent use.

2. The foundation soil layer is flat and there should be no sharp objects such as stones to prevent the GCL from being pierced and affecting the waterproof effect. If the flatness does not meet the requirements, it is recommended to make 300mm thick medium sand or 30mm-50mm thick cement mortar leveling layer.

3. GCL can be constructed in a humid environment, but should not be immersed in water.

4. If the elevation of the bottom of the foundation soil layer is lower than the groundwater level, effective precipitation measures should be taken to drain the accumulated water.

The laying of GCL

1. Lap along the water flow direction, that is, the upstream GCL overlaps the downstream GCL.

2. The lap joint should be smooth and the lap length ≥300mm.

3. Sprinkle 0.4kg-0.6kg / m bentonite powder evenly at the joint.

4. Consider the sinking deformation of the foundation. If necessary, GCL can be wrinkled 1 or 2 at the bottom, and the wrinkle length is 100mm.

5. GCL's non-woven geotextile is laid on the white surface, covered with 300mm thick rammed clay, medium sand or 60mm-100mm thick plain concrete, and 50mm thick cement mortar can be used to embed pebbles with a particle size of 50-80. When the angle between the slope bottom and the slope waterproof slope is greater than 1: 3, cover the slope slope waterproof slope with 100mm thick plain concrete.

6. When laying GCL, the edge laying height is 100mm higher than the design water level.

7. If the pipeline or pile head crosses the GCL, first use a complete GCL to strengthen the bottom according to its pipe diameter and 300mm perimeter. After laying the whole roll, stir the bentonite powder into slurry to coat the edge .

GCL fixed

1. When sloping natural cliffs, anchor grooves are set around the river and lake, depth ≥400mm, width ≥400mm, turn the edge of GCL into and backfill anchor.

2. When vertical revetment, fix it with the surrounding structure with steel nails.

Requirements for water discharge from artificial lake

1. After the construction is completed, clean up the site and clean up all garbage and debris;

2. The water quality is clean, and no polluted water or seawater is allowed.

The above is the construction scheme of artificial lake lake organized by Taian Hongyuan Geosynthetics Co., ltd. I hope it is useful to everyone!

Construction scheme of artificial lake

Construction scheme of artificial lake
Previous:Characteristics of geomembrane composite with non-wovennext:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.tehfbbd.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

久久人妻内射| 男人午夜在线观看| 午夜福利片三级| 美女在线免费成人| 国产女同精品一区二区三区| 亚洲黄色AV软件| 欧美在线免费一区| 在线视频免费播放成人在线| 三上悠亚中文字幕日产乱码在线| 日韩欧美一区二区| 电影天堂久久日韩| 青青草日韩国产免费| 新激情福利在线视频网站| 一本一道久久a久久精品综合|99| 亚洲人操日本| 国产日韩欧美三级片免费观看| 美女张开腿一区二区| 色婷婷色zozoxxx91| 亚洲午夜王网| 久久久久久999金典视频| 内射 日韩| 国产美女乳头无马赛克视频| 乱码日韩AV| 欧美一级α| 九九久久区| 在线国产欧美视频| 亚洲综合视频欧美综合视频 | 大胆福利小视频| 人人人人澡人人爽人人| 亚洲欧美国产精品第2页| 国产中文三级视频在线播放| 国内91偷拍在线观看| 欧美亚洲日韩国产无码| 日产 国产 欧美 精品 另类| 日本久久久久性| 日本午夜寻花一区二区三区| 久久婷婷综合免费| 日韩91av在线不卡| 精品国产乱码久久| 一级无码激情网| 欧洲vs日本vs亚洲一线二线高清|