国产亚洲精品女人久久久久久,中文字幕综合97,久久久久久久丫久久久极品,欧美日韩国产成人自拍

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

What are the requirements for the base surface when laying GCLs?

Release time:2020-4-7    This article is read :4430 Times

Taian Hongyuan Geosynthetics Co., ltd.

Taian Hongyuan Geosynthetics Co., ltd. has been engaged in the production and sales of GCLs for many years, what are the requirements when laying the base surface. Taian Hongyuan Geotechnical Materials Co., Ltd., as a manufacturer of GCLs, let the editors take you together to understand what are the requirements for the base surface when laying GCLs?

1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL (GCL) or the upper layer of geosynthetics.

2. The surface of the foundation soil needs to be flat, uniform and the slope and elevation are within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements.

The base surface should facilitate the laying of GCL (GCL), HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

3. Before laying the GCL (GCL), whether the upper surface of the foundation of the soil cushion (GCL) should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL (GCL).

4. After the daily work, we prepare a signed foundation soil surface permit certificate, which needs to be signed by the owner ’s representative and then handed over to the supervision engineer.

5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL (GCL) that has been accepted becomes unqualified, the installed GCL (GCL) needs to be reopened and re-prepared 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

What are the requirements for the base surface when laying GCLs?
Previous:How to check the quality of the construction of GCL?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.tehfbbd.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

日韩国产福利在线| 激情 成人 黄色| 国外日骚逼视频| 狂艹b免费在线播放| 人妻激情免费视频| 欧美日韩国产第八页| 日韩欧美中文字幕精品偷拍| 欧美日韩国产蜜臀| 欧美黄色大片免费| 人妻少妇被粗大爽| 91嫩草久久| 麻豆午夜网| 国产无码观看一区| 黄片精品一区二区| 射日本少妇| 国产欧美一区二区精品久| 午夜福利在线免费视频| 黄色电影三级片香蕉视频| 亚洲成人sm免费在线观看| 久久久久久久高清| 8848日韩欧美成人| 91精品久久久美臀| 逼特逼 欧美成人视频| wwwwww一区男女网站| 精品少妇AV二区三区| 久久视频高潮| 精品国产乱码91一区二区三区| 亚洲Av片毛片成人观看| 卡AV在线网日| 欧美精品啪视频| 白浆一区二区三区| 99日韩一区| 亚洲国产精品久久婷婷| 无码H视频| 日本黄色91网站| 在线直接看日B视频| 男人天堂看黄片| 午夜欧美亚洲大片| 2020亚洲人妻| 久久久久入| 欧美精产国品一区二区视频|